Town Council Hotline

(During Office Hours)

6259 6700

EMSU Hotline (24 Hours)

1800 241 7711

A A A

Town Council Hotline

(During Office Hours)

6259 6700

EMSU Hotline

(24 Hours)

1800 241 7711

Town Council Hotline

(During Office Hours)

6259 6700

EMSU Hotline (24 Hours)

1800 241 7711

A A A

Town Council Hotline

(During Office Hours)

6259 6700

EMSU Hotline

(24 Hours)

1800 241 7711

  • Share:

Town Improvement Projects

Completed Projects

Click on the images to enlarge.

}
No. Location
1 PLAZA@128 near Blk 128 Toa Payoh Lorong 1
2 Relaxation Plaza At Blk 175 Lorong 2 Toa Payoh
3 PLAY@Heights Park at Blk 144 Lorong 2 Toa Payoh

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Block 200 Toa Payoh North
2 Blk 17 Lorong 7 Toa Payoh
3 Blk 12 Lorong 7 Toa Payoh
4 Blk 172 Lorong 1 Toa Payoh
5 Blk 309 Shunfu Road
6 Blk 273A Bishan St 24
7 Blk 195 Kim Keat Ave
8 Blk 138A/138B Lor 1A Toa Payoh
9 Blk 139/139A Lor 1A Toa Payoh
10 Blk 85A Lorong 4 Toa Payoh
11 Blk 53 Lorong 5 Toa Payoh
12 Blk 293 Bishan St 22
13 Blk 164 Bishan St 13
14 Blk 301 Shunfu Road
15 Blk 181 Bishan St 13
16 Blk 303 Shunfu Road

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Blk 118 Lorong 1 Toa Payoh
2 Blk 228 Lor 8 Toa Payoh
3 Blk 293 Bishan St 22
4 Blk 105 Bishan St 12
5 Blk 301 Shunfu Road
6 Blk 146 Bishan St 11

In Progress Projects

No. Location
1 Blk 184 and 185 Bishan St 13
2 Blk 128 Lorong 1 Toa Payoh

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Construction of linkway connecting from Thomson Community Centre to Shunfu Estate at Shunfu Road
2 Covered Linkway From Existing Linkway Of Block 144 Lorong 2 Toa Payoh To Toa Payoh West Community Club
3 Construction of Shelter Over Existing Barrier Free Access (BFA) Ramp at Blk 25 Sin Ming Road
4 Construction of Drop Off Porch at Block 313 Shunfu Road
5 Construction of Covered Shelter Over Existing Ramp at Blk 23 Toa Payoh East to the Bus Stop
6 Construction of Covered Linkway From Existing Linkway Between Blk 26 and Blk 27 Toa Payoh East to the Lift Access at the Pedestrian Overhead Bridge
7 Construction of Covered Link-way from Block 293 and 288 Bishan St 22/24 Connecting to the LTA Covered Link-way Along Bishan St 22, and Linking to the Existing Covered Link-way in front of Block 282 Bishan St 22
8 Upgrading of covered linkway from Blk 27 Toa Payoh East to Blk 257 Kim Keat Ave
9 Covered linkway from MSCP at Blk 35A to existing linkway between Blk 36 and 35A Lorong 5 Toa Payoh
10 Covered Shelter over existing BFA ramp near Blk 275A Bishan St 24
11 Covered linkway from Block 203 to 205 Toa Payoh North
12 Covered linkway from Block 239 Lor 1 Toa Payoh to bus-stop
13 Covered Linkway from Blk 68 Lorong 5 Toa Payoh to Bus Stop
14 Shelter Over Existing Barrier Free Access (BFA) Ramp at Blk 25 Sin Ming Road
15 Extension of Existing Covered Linkway From Blk 147 Lorong 2 Toa Payoh to Toa Payoh West Community Club
16 Covered Walkway at Block 146 Bishan St 11
17 Covered Linkway from Blk 405 to 410 Sin Ming Ave
18 Drop Off Porch at Block 313 Shunfu Road
19 Covered Link Bridge / Linkway and New Home Lift Behind Block 145 Bishan St 11
20 Upgrading of Existing High Linkway, and Provision of Fixed Awning at Blk 196 Bishan St 13
21 Upgrading of Existing Barrier Free Access (BFA) Ramp with Shelter at Blk 179 Bishan St 13
22 Construction of Sheltered BFA Ramp at Block 145 Bishan St 11
23 Shelter over existing BFA at Blk 153 Lorong 2 Toa Payoh
24 Drop-Off Point cum Covered Linkway Behind Blk 125 Bishan St 12
25 Covered Linkway and High Linkway with BFA Ramp from Blk 158 to 163 Lorong 1 Toa Payoh
26 Low Covered Walkway & Drop-Off Porch at Blk 219 Lorong 8 Toa Payoh
27 High Linkway and Low Linkway between Blk 213 to 211 & 212 Lorong 8 Toa Payoh
28 Covered Linkway from Blk 143 Lorong 2 Toa Payoh to Bus-Stop
29 Drop-off Point and Low Covered Linkway at Block 301 Shunfu Road
30 Construction of Drop-Off Porch Cum Sheltered Linkway at Blk 176 Bishan St 13
31 Construction of Covered Linkway from Existing Drop-Off Point beside Blk 85C Lorong 4 Toa Payoh to Rear Gate of Kheng Cheng School
32 Expansion of Existing High Covered Linkway from Blk 103 to 104 Lorong 1 Toa Payoh
33 Expansion of Existing High Covered Linkway from Blk 105 to 106 Lorong 1 Toa Payoh
34 Construction of High & Low covered linkway from Blk 138 Lorong 1A Toa Payoh MSCP to Proposed Covered Plaza at State Land near Blk 127 Lorong 1 Toa Payoh
35 Construction of Drop-off Point Between Blk 109 & 111 Lorong 1 Toa Payoh
36 Construction of Low Linkway from existing shelter over BFA Ramp near Blk 25 Sin Ming Road to Bus Stop
37 Construction of Drop off Point at Blk 23 Sin Ming Road

In Progress Projects

No. Location
1 Construction of Low & High Linkway over Pedestrian Crossing from Blk 21 to Blk 14A Lorong 7 Toa Payoh
2 Construction Of Sheltered BFA Ramp Between Blk 405 And 406 Sin Ming Avenue
3 Construction of High and Low linkway from Blk 210 Lorong 8 Toa Payoh Market to Blk 3A Lorong 7 Toa Payoh MSCP
4 Construction of High and Low Linkway from Blk 199 to 201 Toa Payoh North
5 Construction of shelter over existing BFA Ramp connecting from existing shelter between Blk 228 Bishan Street 23 and Blk 234 Bishan Street 22 to existing shelter between Blk 226 Bishan Street 23 and Blk 235 Bishan Street 22

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Construction of BFA Ramp from Blk 264 Toa Payoh East to Main Road at Lorong 6 Toa Payoh
2 Construction of BFA Ramp at Existing High Linkway at Block 301 Shunfu Road

In Progress Projects

No. Location
1 Construction of BFA ramp with awnings to sheltered staircases near Blk 406 Sin Ming Avenue Lift A

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Blk 86 Lor 2 Toa Payoh
2 Blk 80 Lor 4 Toa Payoh
3 Blk 135 Bishan St 12

Completed Projects

Click on the images to enlarge.

}
No. Location
1 Sports facilities at Blk 222 Lorong 8 Toa Payoh
2 Badminton Court at Blk 194 Kim Keat Avenue